MASTER CARPENTER

1. Obtain a copy of the script and read it.

2. In consultation with the Scene Designer (SD) and/or Technical Director (TD), develop a plan for building the set.

3. Develop a schedule for building the Set.

4. Attend all Production Staff Meetings.

5. Oversee the building and assembling of the set.

6. Make any repairs tot he completed set as needed.

7. In cooperation with the TD, organize the Strike.

8. Attend Strike.