MASTER ELECTRICIAN Preparing for the Show
1. Obtain a copy of the script and read it.
2. Meet with the Lighting Designer and Board operator to go over the lighting design and plan for the light hang.
3. In consultation with the Technical Director (TD) and Lighting Designer (LD), develop a schedule for the light hang.
4. Conduct an orientation session with all new light crew members, including THA11 students.
5. Schedule and supervise the THA11 students.
6. At the light hang:
- strike all lights previously hung
- supervise hanging lights according to the light design
- confer with the LD and/or TD when all lights have been hung
- make any adjustments noted by the LD or TD
7. Attend the Technical Rehearsal and Cue to Cue and make note of any lights that need to be moved, refocused or otherwise adapted. After the rehearsal, make those changes.
Running the Show
1. During the run of the show participate in the pre-show light check and make any necessary repairs or refocusing.
2. Attend strike at the end of the show.
3. Complete evaluation of THA11 students (see appendix II) and turn in to Dr. Cummins on or before Monday after strike.